Navin’s RP Enclave

Embrace the real Madras, In the heart of Royapuram. Amidst the bustle of daily life, we often miss out on the simple joys. Be it enjoying your space, relaxing with the family in the evenings or enjoying the sight of nature from the comfort of your home. At Navin’s RP Enclave, you'll experience life differently. This micro-community of 30 apartments is built in the Bauhaus style of architecture, constructed around two prevailing trees, that celebrates the sustainability and modern design.

project banner

Apartment

3 & 4 BHK

project banner

Project Status

Ongoing

project banner

AREA

1327 - 2063 sq.ft

project banner

Rera No

TN/29/Building/0458/2024

project banner

Location

Royapuram

project banner

Features

Gallery

Specifications

Walls

Autoclaved Aerated blocks with Smart fix or Equivalent Adhesive                      

Main Door

3.5 width and 8 feet tall teakwood door Frame with 40 mm thick solid wood designer shutter, PU polished on

Bedroom Door

Good quality wooden door Frame with 35 mm thick both side laminated finish shutters

Toilet door

Toilet & balcony good quality WPC Frame with 32 mm both side laminate flush door.

Windows and Ventilators

Excellent quality UPVC windows and ventilators

Kitchen

Polished granite platform with a Stainless-steel sink (Frankie or Equivalent) with drain board and 2’0” high ceramic tile dado above

Flooring

Living, Dining & Bedroom – Double charged vitrified tiles.
Toilets – Ceramic tile flooring and designer wall dadoing up to false

Plumbing and Sanitary Installation

All Sanitary and CP fittings will be of Jaquar or equivalent make. Wall hung washbasin in all toilets and dining

Electricity

Three phase electrical supply with concealed wiring and ACCL.
Concealed FRLSH (Fire Retardant Low Smoke Low Halogen) copper wiring and circuit

Finishing

Internal walls and ceilings – Finished with putty and NAVIN’S oyster white premium emulsion paint.
The outer walls are finished with

Water supply arrangement

Bore well/ Open well for tapping ground water to sump. To pump water from the sump to the OHT, pumping

Lift

Automatic Eight passenger lift of Reputed make with ARD function

Staircase

SS Modular Handrails.

DG Power Backup

1000 watts of 24 x 7 back up to all apartments (Essential fan and lights)
100% 24x7 power back up for

LOCATION


ADVANTAGE

Stanly Medical College and Hospital

1.9 km

Sir Thyagaraja College

2.6 km

Dr. Ambedkar Government Law College

4 km

Sri Kanyaka Parameswari Arts and Science College

4 km

Government College of Fine Arts

6 km

University of Madras

7 km

Presidency College

7 km

St. Annes Matriculation School

240 m

Saffa Matriculation School

240 m

Sri Chaithanya School

400 m

St. Kevins Anglo Indian Matriculation School

500 m

St. Peters Higher Secondary School

800 m

Nichani Health care

120 m

Unani Government Hospital Royapuram

350 m

Stanly Medical College and Hospital

1.9 km

Sri Hospitals

2.1 km

Apollo Hospitals Thondiarpet

2.7 km

St Rayapper Church

240 m

Royapuram Jamia Masjith

240 m

Viyagula Mada Church

700 m

Hazarath Kunakudi Masthan Dargah

1.1 km

Kaligambal Temple

3.2 km

Kandakottam Murugan Temple

5.6 km

IDreams Cinemas

1.2 km

MM Theatre (Thondiarpet)

2.3 km

Express Avenue

9.3 km

Nearer Metro – Thondiarpet Metro

2.3 km

Beach railway Station

2.8 km

Brodway Bustand

4.5 km

Central Railway Station

6.5 km

Stanly Medical College and Hospital

1.9 km

Sir Thyagaraja College

2.6 km

Dr. Ambedkar Government Law College

4 km

Sri Kanyaka Parameswari Arts and Science College

4 km

Government College of Fine Arts

6 km

University of Madras

7 km

Presidency College

7 km

St. Annes Matriculation School

240 m

Saffa Matriculation School

240 m

Sri Chaithanya School

400 m

St. Kevins Anglo Indian Matriculation School

500 m

St. Peters Higher Secondary School

800 m

Nichani Health care

120 m

Unani Government Hospital Royapuram

350 m

Stanly Medical College and Hospital

1.9 km

Sri Hospitals

2.1 km

Apollo Hospitals Thondiarpet

2.7 km

St Rayapper Church

240 m

Royapuram Jamia Masjith

240 m

Viyagula Mada Church

700 m

Hazarath Kunakudi Masthan Dargah

1.1 km

Kaligambal Temple

3.2 km

Kandakottam Murugan Temple

5.6 km

IDreams Cinemas

1.2 km

MM Theatre (Thondiarpet)

2.3 km

Express Avenue

9.3 km

Nearer Metro – Thondiarpet Metro

2.3 km

Beach railway Station

2.8 km

Brodway Bustand

4.5 km

Central Railway Station

6.5 km

Constructions Updates

Project update 0-0

Foundation in Progress

Project update 0-1

Foundation in Progress

Project update 0-2

Foundation in Progress

Project update 1-0

Stilt Floor Column Concrete Work in Progress

Project update 1-1

Stilt Floor Plinth Beam - Base Block Work in Progress

Project update 2-0

First Floor Roof Concrete Part 1 Work is in Progress

Project update 2-1

Project update 3-0

First Floor Roof Shuttering Work is in Progress Front View

Project update 3-1

Project update 3-2

Project update 4-0

Third Floor Column Concrete work is in progress

Project update 5-0

First Floor Block work is in progress

Project update 6-0

Third Floor Column Concrete work is in progress

Project update 7-0

Fourth Floor Roof work is in progress

Project update 8-0

Second Floor Block work is in progress

Project update 9-0

Fourth Floor Roof work is in progress

Project update 10-0

Project update 11-0

Project update 12-0

Project update 13-0

Project update 14-0

Project update 15-0

Project update 16-0

Project update 17-0

Project update 18-0

Project update 19-0

Project update 20-0

Project update 21-0

Project update 22-0

Project update 23-0

Project update 24-0

Project update 25-0

Project update 26-0

Project update 27-0

Project update 28-0

Project update 29-0

Project update 30-0

Project update 31-0

Project update 32-0

Project update 33-0

Project update 34-0

Project update 35-0

Project update 36-0

Project update 37-0

Project update 38-0

Project update 39-0

Project update 40-0

Project update 41-0

Project update 42-0

Project update 43-0

Terrace floor landscape work has been 30% completed

Project update 44-0

Toilet CP & Sanitary fitting work has commenced

Project update 45-0

Window grill fitting work has been 100% completed

Project update 46-0

Internal Door fixing work in progress

Project update 47-0

Stilt Floor Podium landscape work has been 50% Completed

Project update 48-0

Switch boxes Fixing work has been commenced

Project update 49-0

External 1st coat painting work has been completed

Project update 50-0

External 1st coat painting work has been completed

Project update 51-0

Terrace floor landscape work has been completed

Frequently Asked Questions

Property address: 
Door no- 24/64, Arathoon road, Pudumanaikuppam, Royapuram, Chennai – 600013.

RCC framed structure. 
Stilt+5 floors, 
1block

6 units per floor
3BHK – 4 no's
4BHK – 2 no's

Approx 38 % on super built up.

The current expected time of completion is early 2026.
 

2Automatic 8 passenger lift of Reputed make with ARD function
 

Spacious 3 BHK + 2T = 5 no
Spacious 3 BHK + 3T = 15 no
Spacious 4 BHK + 4T = 10 no
 

Our Ongoing Projects

logo