Navin’s RP Enclave

Embrace the real Madras, In the heart of Royapuram. Amidst the bustle of daily life, we often miss out on the simple joys. Be it enjoying your space, relaxing with the family in the evenings or enjoying the sight of nature from the comfort of your home. At Navin’s RP Enclave, you'll experience life differently. This micro-community of 30 apartments is built in the Bauhaus style of architecture, constructed around two prevailing trees, that celebrates the sustainability and modern design.

project banner

Apartment

3 & 4 BHK

project banner

Project Status

Ongoing

project banner

AREA

1327 - 2063 sq.ft

project banner

Rera No

TN/29/Building/0458/2024

project banner

Location

Royapuram

Navin’s RP Enclave RERA QR code
project banner

Walkthrough Video


Features

Gallery

Specifications

Walls

Autoclaved Aerated blocks with Smart fix or Equivalent Adhesive                      

Main Door

3.5 width and 8 feet tall teakwood door Frame with 40 mm thick solid wood designer shutter, PU polished on

Bedroom Door

Good quality wooden door Frame with 35 mm thick both side laminated finish shutters

Toilet door

Toilet & balcony good quality WPC Frame with 32 mm both side laminate flush door.

Windows and Ventilators

Excellent quality UPVC windows and ventilators

Kitchen

Polished granite platform with a Stainless-steel sink (Frankie or Equivalent) with drain board and 2’0” high ceramic tile dado above

Flooring

Living, Dining & Bedroom – Double charged vitrified tiles.
Toilets – Ceramic tile flooring and designer wall dadoing up to false

Plumbing and Sanitary Installation

All Sanitary and CP fittings will be of Jaquar or equivalent make. Wall hung washbasin in all toilets and dining

Electricity

Three phase electrical supply with concealed wiring and ACCL.
Concealed FRLSH (Fire Retardant Low Smoke Low Halogen) copper wiring and circuit

Finishing

Internal walls and ceilings – Finished with putty and NAVIN’S oyster white premium emulsion paint.
The outer walls are finished with

Water supply arrangement

Bore well/ Open well for tapping ground water to sump. To pump water from the sump to the OHT, pumping

Lift

Automatic Eight passenger lift of Reputed make with ARD function

Staircase

SS Modular Handrails.

DG Power Backup

1000 watts of 24 x 7 back up to all apartments (Essential fan and lights)
100% 24x7 power back up for

LOCATION


ADVANTAGE

Stanly Medical College and Hospital

1.9 km

Sir Thyagaraja College

2.6 km

Dr. Ambedkar Government Law College

4 km

Sri Kanyaka Parameswari Arts and Science College

4 km

Government College of Fine Arts

6 km

University of Madras

7 km

Presidency College

7 km

St. Annes Matriculation School

240 m

Saffa Matriculation School

240 m

Sri Chaithanya School

400 m

St. Kevins Anglo Indian Matriculation School

500 m

St. Peters Higher Secondary School

800 m

Nichani Health care

120 m

Unani Government Hospital Royapuram

350 m

Stanly Medical College and Hospital

1.9 km

Sri Hospitals

2.1 km

Apollo Hospitals Thondiarpet

2.7 km

St Rayapper Church

240 m

Royapuram Jamia Masjith

240 m

Viyagula Mada Church

700 m

Hazarath Kunakudi Masthan Dargah

1.1 km

Kaligambal Temple

3.2 km

Kandakottam Murugan Temple

5.6 km

IDreams Cinemas

1.2 km

MM Theatre (Thondiarpet)

2.3 km

Express Avenue

9.3 km

Nearer Metro – Thondiarpet Metro

2.3 km

Beach railway Station

2.8 km

Brodway Bustand

4.5 km

Central Railway Station

6.5 km

Stanly Medical College and Hospital

1.9 km

Sir Thyagaraja College

2.6 km

Dr. Ambedkar Government Law College

4 km

Sri Kanyaka Parameswari Arts and Science College

4 km

Government College of Fine Arts

6 km

University of Madras

7 km

Presidency College

7 km

St. Annes Matriculation School

240 m

Saffa Matriculation School

240 m

Sri Chaithanya School

400 m

St. Kevins Anglo Indian Matriculation School

500 m

St. Peters Higher Secondary School

800 m

Nichani Health care

120 m

Unani Government Hospital Royapuram

350 m

Stanly Medical College and Hospital

1.9 km

Sri Hospitals

2.1 km

Apollo Hospitals Thondiarpet

2.7 km

St Rayapper Church

240 m

Royapuram Jamia Masjith

240 m

Viyagula Mada Church

700 m

Hazarath Kunakudi Masthan Dargah

1.1 km

Kaligambal Temple

3.2 km

Kandakottam Murugan Temple

5.6 km

IDreams Cinemas

1.2 km

MM Theatre (Thondiarpet)

2.3 km

Express Avenue

9.3 km

Nearer Metro – Thondiarpet Metro

2.3 km

Beach railway Station

2.8 km

Brodway Bustand

4.5 km

Central Railway Station

6.5 km

Site Progress

Constructions Updates

Follow the month-on-month progress at site through our latest photographs.

Foundation in Progress

Foundation in Progress

Foundation in Progress

Foundation in Progress

Foundation in Progress

Foundation in Progress

Stilt Floor Column Concrete Work in Progress

Stilt Floor Column Concrete Work in Progress

Stilt Floor Plinth Beam - Base Block Work in Progress

Stilt Floor Plinth Beam - Base Block Work in Progress

First Floor Roof Concrete Part 1 Work is in Progress

First Floor Roof Concrete Part 1 Work is in Progress

Site progress update 2-1
First Floor Roof Shuttering Work is in Progress Front View

First Floor Roof Shuttering Work is in Progress Front View

Site progress update 3-1
Site progress update 3-2
Third Floor Column Concrete work is in progress

Third Floor Column Concrete work is in progress

First Floor Block work is in progress

First Floor Block work is in progress

Third Floor Column Concrete work is in progress

Third Floor Column Concrete work is in progress

Fourth Floor Roof work is in progress

Fourth Floor Roof work is in progress

Second Floor Block work is in progress

Second Floor Block work is in progress

Fourth Floor Roof work is in progress

Fourth Floor Roof work is in progress

Site progress update 10-0
Site progress update 11-0
Site progress update 12-0
Site progress update 13-0
Site progress update 14-0
Site progress update 15-0
Site progress update 16-0
Site progress update 17-0
Site progress update 18-0
Site progress update 19-0
Site progress update 20-0
Site progress update 21-0
Site progress update 22-0
Site progress update 23-0
Site progress update 24-0
Site progress update 25-0
Site progress update 26-0
Site progress update 27-0
Site progress update 28-0
Site progress update 29-0
Site progress update 30-0
Site progress update 31-0
Site progress update 32-0
Site progress update 33-0
Site progress update 34-0
Site progress update 35-0
Site progress update 36-0
Site progress update 37-0
Site progress update 38-0
Site progress update 39-0
Site progress update 40-0
Site progress update 41-0
Site progress update 42-0
Terrace floor landscape work has been 30% completed

Terrace floor landscape work has been 30% completed

Toilet CP & Sanitary fitting work has commenced

Toilet CP & Sanitary fitting work has commenced

Window grill fitting work has been 100% completed

Window grill fitting work has been 100% completed

Internal Door fixing work in progress

Internal Door fixing work in progress

Stilt Floor Podium landscape work has been 50% Completed

Stilt Floor Podium landscape work has been 50% Completed

Switch boxes Fixing work has been commenced

Switch boxes Fixing work has been commenced

External 1st coat painting work has been completed

External 1st coat painting work has been completed

External 1st coat painting work has been completed

External 1st coat painting work has been completed

Terrace floor landscape work has been completed

Terrace floor landscape work has been completed

Transformer installation work has been completed

Transformer installation work has been completed

Panel board has been fixed and internal flat wiring has been commenced

Panel board has been fixed and internal flat wiring has been commenced

Site progress update 54-0
External duct covering work has been 90% completed

External duct covering work has been 90% completed

Terrace floor Landscape work is in progress

Terrace floor Landscape work is in progress

Flat Internal DP Dressing work has been commenced

Flat Internal DP Dressing work has been commenced

Toilet False ceiling work has been 90% completed

Toilet False ceiling work has been 90% completed

Stilt floor lighting work has been 100% completed

Stilt floor lighting work has been 100% completed

Switch plate fixing & Internal wiring has been 50% completed

Switch plate fixing & Internal wiring has been 50% completed

Car parking area Paver Block laying work has been 100% completed

Car parking area Paver Block laying work has been 100% completed

Stilt Floor Landscape work is in Progress

Stilt Floor Landscape work is in Progress

April Month completed Milestone Details

April Month completed Milestone Details

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site Progress

Site progress update 70-0
Site progress update 70-1
Site progress update 70-2
Site progress update 71-0
Site progress update 71-1
Site progress update 71-2
Site progress update 71-3
Site progress update 71-4
Site progress update 71-5
Site progress update 71-6
Site progress update 71-7
Site progress update 71-8
Site progress update 72-0
Site progress update 72-1
Site progress update 72-2
Site progress update 72-3
Site progress update 72-4

Frequently Asked Questions

Property address: 
Door no- 24/64, Arathoon road, Pudumanaikuppam, Royapuram, Chennai – 600013.

RCC framed structure. 
Stilt+5 floors, 
1block

6 units per floor
3BHK – 4 no's
4BHK – 2 no's

Approx 38 % on super built up.

The current expected time of completion is early 2026.
 

2Automatic 8 passenger lift of Reputed make with ARD function
 

Spacious 3 BHK + 2T = 5 no
Spacious 3 BHK + 3T = 15 no
Spacious 4 BHK + 4T = 10 no
 

Our Ongoing Projects

logo
WhatsAppCall