Book Your Site Visit

Disclaimer!

By using or accessing this website, you agree with the Disclaimer without any qualification or limitation. The company (Navin's Group of companies* herein referred to as company) reserves the right to change , modify, alter, terminate, revoke, add and/or delete any one or more of the material, and terms and conditions of the website without any obligation to notify the visitor of the modification / variation / amendment to the terms and conditions or material and the visitor shall be bound by such amendments / modifications / variations.

The visuals and information contained herein are artistic impressions being indicative in nature and are for illustrative and general information purposes only. The visuals contained and other graphics / images / photographs are general images and may not have any correlation with the project. No furniture or accessories shown in any of the visuals are provided with the apartment/unit/project.

The imagery used in the website may not represent actuals or may be indicative of style only. Photographs / images of interiors, surrounding views and building views may not represent actuals or may have been digitally enhanced or altered. Computer generated images, walkthroughs and rendered images are the artist's impression and are only indicative of the actual designs.

No information given on this Website creates a warranty or expand the scope of any warranty that cannot be disclaimed under the applicable laws. The information on this website is presented as general information and no representation or warranty is expressly or impliedly given as to its accuracy. Any interested party should verify all the information including designs, plans, specifications, facilities, features, payment schedules, terms of sales etc. independently with the Company prior to concluding any decision for buying or booking in any of the projects.

While enough care is taken by the Company to ensure that information in the website are up to date, accurate and correct, the readers/users are requested to make an independent enquiry with the Company before relying upon the same. Nothing on the website should be misconstrued as advertising, marketing, booking, selling or an offer for sale or invitation to purchase a unit in any project by the Company. The Company is not responsible for the consequences of any action taken by the viewer relying on such material/ information on this website without independently verifying with the Company.

Please note that by sharing any of the contact details including mobile number, email id etc., on the website by the reader, The reader is authorizing Navin’s (even if the reader is registered on the Do Not Disturb Registry) to provide information on our projects over calls, SMS, Email & Whatsapp and other modes of communication

I agree

  594 Apartments

  2 BHK

  Stilt + 21 Floors

  803 Sqft To 1176 Sqft

RERA Registration ID:  TN/01/ Building/ 0245/2022 |

TN/01/ Building/ 0246/2022

www.rera.tn.gov.in/

 

Phase 3

     2 Bed 2 Bath

 

     Medavakkam – Mambakkam Main Road,

Vengaivasal, Chennai.

     Status: Under Construction

NAVIN’S STARWOOD TOWERS 3.0

Welcome to thoughtfully designed Super Smart Homes

Control your home at the click of a button

Yes! Every home at Navin’s Starwood Towers 3.0 is automated, making your living absolutely delightful. Your homes are aesthetically designed to bring fresh air and sunshine throughout the day. With about 79% open spaces and vast green spaces around, wake up to beautiful balcony views everyday. Every square feet of your home has been optimized to offer you a comfortable living.

Features

  • Mivan Technology
  • Smart phone door access
  • Smart phone light & fan control
  • Wi-fi enabled community
  • Individual sensor lighting in car park and common areas
  • Electric car charge points
  • Solar power for common area consumables
  • Self-cleansing garbage chutes
  • Automated ventilation system in the basement parking with CO sensor
  • Schools
  • Colleges
  • Hospitals
  • Dine Out
  • Entertainment
  • Public Transport

Security

Car Parking

Children’s Play Area

CCTV (with security cameras)

Gym

Yoga/Meditation Hall

Table Tennis

Games Room

Swimming pool

Library

Shopping Area

ATM

Street Lighting

Avenue Trees

Gated Community

Wide Streets

Structure

Seismic Zone III Complaint RCC wall structure using latest MIVAN formwork technology.

Walls

RCC walls.

Flooring

Double charged Vitrified tile flooring inside the flat.

Windows

Good quality UPVC sliding windows.

Toilet

Ceramic Tiles Flooring and designer wall dadoing upto 7 ht with good quality fittings.

Doors

PIN Controlled Smart Door lock of Yale Make or Similar teak wood framed main doors  with designers flush doors.Other doors with good quality wood frame with laminate shutters.

Garbage Disposal

Self cleansing SS garbage chute.

Home Automation

1.Smart phone and Voice controlled access for few lights.

2.Main door lock with passcode and key access.

Electricity

1.Three Phase Electric Power Supply with cocealed FRLS copper wiring and Circuit breakers.

2.AC Points in all Bedrooms and AC Point  preparation in living room.

3.Branded Modular switches.

4.Acoustically insulated standby generated back-up for common area and 500 wattsfor each apartments.

Finishing

1.Internal walls are finished with Putty and Navins’s oyster white colour with Emulsion Paint.

2.Outer walls finished with premium anti-fungal emulsion paint over texture.

Lifts

3 nos. of  10 passenger and 1 no. of  15 passenger automatic SS lifts in each blocks.

Main Door

Varnish Sealer Finish, other doors- enamel paint, Outer Walls:Exterior Emulsion.

Water

Bore/Open Well for Tapping Ground Water. Sump to store water with arrangements.

Construction Update

September 2023

PHASE 3-A4 MAPLE TOWER

August 2023

PHASE 3- A4 MAPLE TOWER

July 2023

PHASE 3- A4 MAPLE TOWER

June 2023

PHASE 3- A4 MAPLE TOWER

PHASE 3 – A3 CEDAR TOWER

May 2023

PHASE 3- A4 MAPLE TOWER

  • Mivan concreting completed – 11th floor
  • Mivan wall reinforcement & shuttering (WIP) – 12th floor

April 2023

PHASE 3- A4 MAPLE TOWER

  • Mivan concreting completed – 9th floor
  • Mivan wall reinforcement & shuttering (WIP) – 10th floor
  • Putty work 1st Coat completed – 1st floor & 1st floor Lobby
  • Putty work 1st Coat WIP – 2nd floor

PHASE 3 – A3 CEDAR TOWER

  • Stilt floor Mivan wall & roof shuttering (WIP)

March 2023

PHASE 1- A4 MAPLE & PHASE 2- A3 CEDAR

Maple

Cedar

January 2023

MAPLE: 2nd Floor RCC Works – WIP 100% Completed and 3rd Floor RCC Works – WIP 85% Completed

CEDAR: Basement Columns and Shuttering – 85% Completed and Basement Roof – 45% Completed

November 2022

November 2022

MAPLE: Foundation Works – 100% Completed, Basement Works – 100% Completed, Stilt Roof Works – 100% Completed

CEDAR: Excavation 100% Completed, Raft – Foundation 90% Completed, Basement Column and Retaining walls – WIP

October 2022

August 2022

Foundation and Basement Work Completed.

Enquiry Form



    TV AdsPortalsHoardingSocial MediaWebsiteGoogleReferred by a FriendPrint AdRadioBus BackOthers

    Start typing and press Enter to search