Book Your Site Visit

  294 Apartments

  2 BHK

  Stilt + 21 Floors

  877 Sqft To 1285 Sqft

RERA Registration ID:  TN/01/ Building/ 0245/2022 |

TN/01/ Building/ 0246/2022

www.rera.tn.gov.in/

 

Phase 3

     2 Bed 2 Bath

 

     Medavakkam – Mambakkam Main Road,

Vengaivasal, Chennai.

     Status: Under Construction

NAVIN’S STARWOOD TOWERS 3.0

2 Bhk Flats in Medavakkam

Control your home at the click of a button

Yes! Every home at Navin’s Starwood Towers 3.0 is automated, making your living absolutely delightful. Your homes are aesthetically designed to bring fresh air and sunshine throughout the day. With about 79% open spaces and vast green spaces around, wake up to beautiful balcony views everyday. Every square feet of your home has been optimized to offer you a comfortable living.

Features

  • Mivan Technology
  • Smart phone door access
  • Smart phone light & fan control
  • Wi-fi enabled community
  • Individual sensor lighting in car park and common areas
  • Electric car charge points
  • Solar power for common area consumables
  • Self-cleansing garbage chutes
  • Automated ventilation system in the basement parking with CO sensor

Security

Car Parking

Children’s Play Area

CCTV (with security cameras)

Gym

Yoga/Meditation Hall

Table Tennis

Games Room

Swimming pool

Library

Shopping Area

ATM

Street Lighting

Avenue Trees

Gated Community

Wide Streets

Structure

Seismic Zone III Complaint RCC wall structure using latest MIVAN formwork technology.

Walls

RCC walls.

Flooring

Double charged Vitrified tile flooring inside the flat.

Windows

Good quality UPVC sliding windows.

Toilet

Ceramic Tiles Flooring and designer wall dadoing upto 7 ht with good quality fittings.

Doors

PIN Controlled Smart Door lock of Yale Make or Similar teak wood framed main doors  with designers flush doors.Other doors with good quality wood frame with laminate shutters.

Garbage Disposal

Self cleansing SS garbage chute.

Home Automation

1.Smart phone and Voice controlled access for few lights.

2.Main door lock with passcode and key access.

Electricity

1.Three Phase Electric Power Supply with cocealed FRLS copper wiring and Circuit breakers.

2.AC Points in all Bedrooms and AC Point  preparation in living room.

3.Branded Modular switches.

4.Acoustically insulated standby generated back-up for common area and 500 wattsfor each apartments.

Finishing

1.Internal walls are finished with Putty and Navins’s oyster white colour with Emulsion Paint.

2.Outer walls finished with premium anti-fungal emulsion paint over texture.

Lifts

3 nos. of  10 passenger and 1 no. of  15 passenger automatic SS lifts in each blocks.

Main Door

Varnish Sealer Finish, other doors- enamel paint, Outer Walls:Exterior Emulsion.

Water

Bore/Open Well for Tapping Ground Water. Sump to store water with arrangements.

Construction Update

April 2024

A4 MAPLE TOWER:

  • Main floor tile work – Overall 34 flats completed
  • Toilet wall & Floor tile – Overall 34 flats completed
  • Internal Putty work (1st coat upto 21st floor) – 50% Completed
  • UPVC window up-to 21st floor – 60% Completed
  • Balcony Grill up-to 21st floor – 80% Completed
  • Staircase Handrail Fixing – 40% Completed
  • Flats Internal door frame & Main door frame (upto 11th floor) – 50% Completed
  • External Texture Finish work – 30% Completed

March 2024

A4 MAPLE TOWER:

  • Main flooring tile work – 17 flats completed
  • Toilet flooring & wall tile work – 17 flats completed
  • Joineries work – 46% completed
  • Flats area Putty work – 48% completed
  • Lobby false ceiling work – 60% Completed
  • Common area work – Work under progress
  • External texture work – Work under progress

JANUARY 2024

A4 MAPLE TOWER:

  • Structural work – upto 21st floor -100% completed
  • Internal putty work – 45% completed
  • Joineries Installation – 35% Completed
  • Internal Flat flooring – 2 sold units & 2 unsold units completed
  • Toilet wall & Floor tile – 2 sold units & 2 unsold units completed
  • Column/wall Reinforcement – 1st floor – 100% completed

November 2023

  • Structural work – Parapet wall, LMR, Headroom – WIP
  • Internal plumbing work – Up to 18th floor – 90% completed
  • Flat 1st coat putty work – Up to 18th floor – 100% completed
  • Flat 2nd coat putty & Emulsion work – Up to 3rd floor – 100% completed
  • UPVC window fixing – Up to 15th floor – WIP
  • Balcony Grill – Up to 16th floor – WIP
  • Toilet wall tile laying – Up to 2nd floor – WIP
  • Main flooring tile – 1st floor – WIP

October 2023

  • Structural work upto 21st floor – 100% completed
  • UPVC window intallation (13th floor) – 100% completed
  • Balcony Grill installtion (14th floor) – 100% completed
  • Flat putty work 1st coat (16th floor) – 100% completed
  • Flat Plumbing work (14th floor) – 80% completed

October 2023

  • 21st floor Roof slab – Work in progress

October 2023

  • 20th floor slab casting completed
  • 21st floor Mivan shuttering & Reinforcement – Work in progress

September 2023

PHASE 3-A4 MAPLE TOWER

August 2023

PHASE 3- A4 MAPLE TOWER

July 2023

PHASE 3- A4 MAPLE TOWER

June 2023

PHASE 3- A4 MAPLE TOWER

PHASE 3 – A3 CEDAR TOWER

May 2023

PHASE 3- A4 MAPLE TOWER

  • Mivan concreting completed – 11th floor
  • Mivan wall reinforcement & shuttering (WIP) – 12th floor

April 2023

PHASE 3- A4 MAPLE TOWER

  • Mivan concreting completed – 9th floor
  • Mivan wall reinforcement & shuttering (WIP) – 10th floor
  • Putty work 1st Coat completed – 1st floor & 1st floor Lobby
  • Putty work 1st Coat WIP – 2nd floor

PHASE 3 – A3 CEDAR TOWER

  • Stilt floor Mivan wall & roof shuttering (WIP)

March 2023

PHASE 1- A4 MAPLE & PHASE 2- A3 CEDAR

Maple

Cedar

January 2023

MAPLE: 2nd Floor RCC Works – WIP 100% Completed and 3rd Floor RCC Works – WIP 85% Completed

CEDAR: Basement Columns and Shuttering – 85% Completed and Basement Roof – 45% Completed

November 2022

November 2022

MAPLE: Foundation Works – 100% Completed, Basement Works – 100% Completed, Stilt Roof Works – 100% Completed

CEDAR: Excavation 100% Completed, Raft – Foundation 90% Completed, Basement Column and Retaining walls – WIP

October 2022

August 2022

Foundation and Basement Work Completed.

Floor Plans

Are you looking for 2 BHK flats for sale in the Medavakkam area of Chennai? Look no further! Navins, a reputed real estate developer, offers a wide range of residential flats for sale in Medavakkam.

Experience the perfect blend of comfort and convenience in these thoughtfully designed flats that cater to all your lifestyle needs. Navin’s Starwood Towers 3.0 provides spacious flats with modern amenities and contemporary architecture that will surely enhance your living experience.

Choose from a variety of configurations such as 2BHK flats to suit your requirements. Navin’s Starwood Towers 3.0 flats are constructed with high-quality materials, ensuring durability and longevity. The well-ventilated interiors and ample natural light create a pleasant living environment.

Located in the bustling area of Medavakkam, these flats provide excellent connectivity to the rest of the city. With proximity to schools, hospitals, shopping centres, and entertainment hubs, Navin’s flats in Medavakkam offer convenience at your doorstep.

The properties also feature amenities like a gymnasium, Smartphone door access, children’s play area, Solar power for common area consumables, landscaped gardens, and 24×7 security to ensure comfortable and safe living for you and your family.

Investing in Navin’s flats in Medavakkam is not just buying a property; it’s acquiring a home that offers a lifestyle upgrade. Don’t miss out on this opportunity to own your dream home in one of Chennai’s most sought-after locations.

Reach out to Navins today to explore the available flats for sale in Medavakkam and make your dream of owning a luxurious home a reality. Hurry, as these flats are in high demand and selling fast!